Laserfiche WebLink
Clear the upland diversion ditch above the RDA of fallen rocks and trees <br />(September 30, 2013) <br />Survey the entire length of the upland diversion ditch above the RDA to allow <br />comparison of constructed ditch with the approved design (September 30, 2013) <br />Both abatement actions were completed in good time. <br />• Pertaining to Good Faith <br />o One step is required to abate the violation: construct the RDA upland diversion ditch so <br />that it is in compliance with the approved design (due 1/24/2014). <br />As of today, December 13, 2013, the NOV has not been terminated. <br />