My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-12_HYDROLOGY - M2013064
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2013064
>
2013-12-12_HYDROLOGY - M2013064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:01 PM
Creation date
12/13/2013 1:48:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
HYDROLOGY
Doc Date
12/12/2013
Doc Name
Varra Companies Riverside Berm Repair
From
Dept of the Army
To
Varra Companies
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Pernlittces are reminded that all compensatory nliligation is required prior to or collcurrcll( <br />Will) IWOject construction to Cnsure compliance with the Final Compensatory Mitigation Rule. A <br />complete copy of,the final Compensatory Mitigation Rule may be oblairlecl at the f�lllowing <br />websilc: http:// ww -vy.tisace.arilly.illll /ceCw /pa es /final cnlr asl». <br />3. Perinitices am eneoaraged to clean heavy equipment prior to and after construction if' <br />equipment was previously used its i1110ther stream, river, lake, pond or wellall(l withlll 10 ((,lyS of <br />iilitl"llillg work in order to prevent the spread of'Ncw Zealancl Mud Snails an(I other aclua(ic <br />hitchhikers: <br />a. Remove all ))lilt) an(l debris from CgLlihlllCnt tracks, turretS, hUckets, drags, teeth, <br />etc.) and keep the equipment dry for 10 clays; or <br />b. Remove all mucl and debris frOIll CgllIplllCllt tracks, tLII-l-CtS, bLICICCIS, (IragS, teeth, <br />etc.) and spray /soak equipment with either a 1:1 SOILltioll oC UOI-nlula /109 <br />1 louschold Cleaner and water, or other approvecl chemical solutions. 'Treated <br />equipment must be kept moist fbr at least 10 minutes; or <br />c. Remove all mu(I and debris from equipment tracks, turrets, buckels, (Irags, teclll, <br />etc.) and spray /soak equipnlcllt With water greater than 120 clegrecs U IOr at least <br />10 Ill inuLes. <br />11. <br />
The URL can be used to link to this page
Your browser does not support the video tag.