Laserfiche WebLink
2. Pernlittces are reminded that all compensatory nliligation is required prior to or collcurrcll( <br />Will) IWOject construction to Cnsure compliance with the Final Compensatory Mitigation Rule. A <br />complete copy of,the final Compensatory Mitigation Rule may be oblairlecl at the f�lllowing <br />websilc: http:// ww -vy.tisace.arilly.illll /ceCw /pa es /final cnlr asl». <br />3. Perinitices am eneoaraged to clean heavy equipment prior to and after construction if' <br />equipment was previously used its i1110ther stream, river, lake, pond or wellall(l withlll 10 ((,lyS of <br />iilitl"llillg work in order to prevent the spread of'Ncw Zealancl Mud Snails an(I other aclua(ic <br />hitchhikers: <br />a. Remove all ))lilt) an(l debris from CgLlihlllCnt tracks, turretS, hUckets, drags, teeth, <br />etc.) and keep the equipment dry for 10 clays; or <br />b. Remove all mucl and debris frOIll CgllIplllCllt tracks, tLII-l-CtS, bLICICCIS, (IragS, teeth, <br />etc.) and spray /soak equipment with either a 1:1 SOILltioll oC UOI-nlula /109 <br />1 louschold Cleaner and water, or other approvecl chemical solutions. 'Treated <br />equipment must be kept moist fbr at least 10 minutes; or <br />c. Remove all mu(I and debris from equipment tracks, turrets, buckels, (Irags, teclll, <br />etc.) and spray /soak equipnlcllt With water greater than 120 clegrecs U IOr at least <br />10 Ill inuLes. <br />11. <br />