My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-10_REVISION - M1977297
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977297
>
2013-12-10_REVISION - M1977297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:32 PM
Creation date
12/12/2013 2:16:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977297
IBM Index Class Name
REVISION
Doc Date
12/10/2013
Doc Name
Reclamation Map cover letter and map TR06
From
Gold Eagle Mining, Inc
To
DRMS
Type & Sequence
TR6
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 7 -a�i 7T-/Z � <br />6old Eagle Dining, Inc. <br />845EMainStreet— Montrose.0 81401 — 970 249 -0404" Nx970249 3292 <br />12/06/2013 RECEIVED <br />Division of Reclamation, <br />Mining Safety Attention: Minerals Program <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />To Whom It May Concern: <br />DEC 10 20134' <br />DASION OF RECL MATICII <br />V.it1;P10111, 0C,fEIr <br />Attached are the Reclamation Maps as requested. GEMI is in agreement with the <br />proposed Technical Revisions. However it must be noted that before any reclamation <br />activities must ensue, will require the approval of DOE. DOE has informed us that <br />reclamation is not an approved activity during the PEIS process. Nor will they review any <br />reclamation plans during the PEIS process or review period and litigation process. <br />Please note that electronic versions will be sent today and hard copies mailed. My <br />apologies if electronic versions are sub - standard. <br />RE: Ellison Mine, Permit M 1978- 342gechnical Revision TR -04 <br />1. Agree <br />2. Agree <br />3. Agree <br />4. Zircon storage buildings are used to secure equipment and materials during various <br />activities as required by DOE lease agreement. One is used by DOE and other GEMI. <br />5. As shown on map. <br />6. Grading and sloping will be accomplished by moving materials uphill to a maximum <br />of 3H:1 V slope in order to reduce the football of reclamation area. <br />7. Re- vegetation will require less than %2 acre. <br />8. This date will depend on DOE approval. <br />RE: Burros Mine: Pe mit M- 1977- 297(/Technical Revis on TR -06 <br />1. Agree <br />2. Agree <br />3. Agree <br />4. Storm water berms will construct in the channels using native boulders in order to <br />assimilate the natural conditions of the surrounding area. Locations are displayed on the <br />attached map and monitored according to storm water permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.