Laserfiche WebLink
�c`il�`3`�� <br />bold Eagle Mining, Inc. <br />845EMainStreet— Montrose,@ 81401 970-249-0404—N070-249-3292 <br />12/06/2013 RECEIVED <br />Division of Reclamation, <br />DEC 1 02013/�' <br />Mining Safety Attention: Minerals Program DIVISION OF RECLAMATICi 1 <br />1313 Sherman Street, Room 215 111II'lNIC ":'J C Y_= I r <br />Denver, CO 80203 <br />To Whom It May Concern: <br />Attached are the Reclamation Maps as requested. GEMI is in agreement with the <br />proposed Technical Revisions. However it must be noted that before any reclamation <br />activities must ensue, will require the approval of DOE. DOE has informed us that <br />reclamation is not an approved activity during the PEIS process. Nor will they review any <br />reclamation plans during the PEIS process or review period and litigation process. <br />Please note that electronic versions will be sent today and hard copies mailed. My <br />apologies if electronic versions are - dard. <br />RE: Ellison Mine, Pe t M 1978 - 342 -Tec ical Revisio R -04 <br />1. Agree <br />2. Agree <br />3. Agree <br />4. Zircon storage buildings are used to secure equipment and materials during various <br />activities as required by DOE lease agreement. One is used by DOE and other GEMI. <br />5. As shown on map. <br />6. Grading and sloping will be accomplished by moving materials uphill to a maximum <br />of 3H:1 V slope in order to reduce the football of reclamation area. <br />7. Re- vegetation will require less than %2 acre. <br />8. This date will depend on DOE approval. <br />RE: Burros Mine: Permit M- 1977- 297-Technical Revision TR -06 <br />1. Agree <br />2. Agree <br />3. Agree <br />4. Storm water berms will construct in the channels using native boulders in order to <br />assimilate the natural conditions of the surrounding area. Locations are displayed on the <br />attached map and monitored according to storm water permit. <br />