Laserfiche WebLink
RIDER TO MINING PERMIT <br />Permit Date: May 23, 2018 <br />Permit No: C- 1982 -056 <br />The following additional stipulations form an integral part of the foregoing permit: <br />Stipulation No. <br />Description <br />64- Twentymile Coal Company is approved to construct the Refuse Disposal Area <br />Expansion in accordance with designs approved in Technical Revision No. 67. <br />Twentymile Coal Company has requested to provide bond for the increased <br />disturbance area in three increments. The first increment, "Initial Bonded <br />Disturbance" of 50.0 acres, is limited to construction of 30.3 acres refuse pile <br />expansion, 2.4 acres haul road corridor, 5.9 acres unclassified stockpile, 3.5 acres <br />topsoil stockpile, 0.4 acres stockpile haul corridors, and 7.5 acres construction of <br />RDA10 and RDAII ditches, as shown on Map C -102 (11/13/2009). Prior to <br />disturbance of the Refuse Disposal Area expansion beyond the Initial Bonded <br />Disturbance, Twentymile Coal Company is required to submit additional bond <br />adequate for disturbances associated with bonding increments I, and II. No <br />disturbance associated with bonding increments I and II shall occur prior to <br />submittal and Division approval of additional bond. <br />ACCEPTED AND AGREED: <br />B �( V i� M <br />Operator Title <br />DIVISION OF RECLAMATION, MINING & SAFETY <br />COLORADO DEPARTMENT OF <br />NATURAL RESOURCES <br />Division Director <br />4FO A <br />