Laserfiche WebLink
<br /> <br />• <br />TABLE A (continued) <br />MONITORING SITES & FREpUENCY <br />SURFACE FLOW MARCH -MAY <br />REGULAR SAMPLING <br />SITE WATER LEVEL & FIELD PARAMETERS <br />FoldelCreek <br /> CONTINGENT SAMPLING <br /> (sample only when pumping site 109 or <br /> 115 is discharging, between 24 hours <br /> aker the discharge hegins and 35 hours <br /> aker it ends) <br />WATER WATER <br /> LAB SULFATE <br />QUALITY (see LEVEL & & LAB EC <br />note, below) FIELD EC <br />USGS 09243800 Schedule A Once in March <br />8 Schedule A Once in March <br />14 Schedule A Once in March <br />USGS 09243900 Schedule A Once in March <br />Fish Creek <br />16A Schedule A Once in March Weekly <br />302 <br />27A Schedule A Once in March <br />1003 Schedule A Once in March Weekly Monthly <br />SW-13 Quarterly • Flowonly, fields semi-annually semi-annually <br />SW-14 Quarterly -Flow only, fields Semi-annually semi-annually <br />SW-15 Quarterly • Flowonly, fields semi-annually semi-annually <br />307 Monthly -Flow only, fields semi-annually <br />305 Monthly -Flow only, fields semi-annually <br />Trout Creek <br />301 Monthly Once in March Weekly Monthly <br />69 Monthly Once in March Weekly Monthly <br />1005 Monthly Once in March Weekly Monthly <br />Mitldle Creek <br />29 Schedule A Once in March Weekly Monthly <br />Schedule A <br />March -Monthly <br />April • Two times during month <br />May -Monthly <br />MR06.208 <br />Exhibit 14-7 <br />Note: If site is frozen, <br />March quality sample may <br />be taken in April. <br />07/27/06 <br /> <br />