Laserfiche WebLink
Road), Maps 70 -75 (Refuse Haul Road and Plant Access Road), Map 82 (Refuse Area), Map 90 <br />(Alluvial Well Area), and Map 150 (B -Seam ventilation shaft facility and access road). There was no <br />topsoil at the Ventilation Entry Area or associated access road. In the refuse disposal area only as <br />much material as required to obtain uniform reclaimed topsoil depth (near the average topsoil depth) <br />was removed. Only soils from areas that were disturbed for facilities were utilized for reclamation. <br />The remainder of the material was separately removed, stockpiled and replaced as subsoil or cover <br />material (see Section 11.1.7.b Topsoil Handling). Appendix V -1 tabulates haul road topsoil volume and <br />mapping area for the existing stockpiles #1 to #11 and future stockpiles #12 to #14. <br />The stripping of material to be used as cover for special non -coal wastes (Section 4.09) or coal waste <br />banks (Section 4.10) in the waste disposal area was done after the topsoil was stripped. Material <br />which was to be stored was treated in the same manner as a permanent topsoil stockpile. Since the <br />thickness of available cover material varied, the stripping depths were varied in order to obtain <br />enough material to provide the required cover. <br />TABLE V -3 <br />SUMMARY OF DISTURBED AREAS <br />DESCRIPTION AREA (ACRES) <br />REFERENCE <br />"D" Portal Area <br />39.09 <br />Maps 23 -28 <br />Water Tank Area & access Road <br />8.17 <br />Maps 52 -54 <br />Haul Road & Plant Access Road <br />17.64 <br />Maps 70 & 71 <br />Haul Road (County Road to Refuse Area) <br />41.95* <br />Maps 71 -75 <br />Refuse Area <br />513.00* <br />Map 76 <br />East Portal/Ventilation Entry Area & road <br />2.86 <br />Maps 85 & 88 <br />B -Vent Shaft ( #1) facility & access <br />1.37 <br />Map 151 <br />B -Vent Shaft #2, SH -1, SH -2, & road <br />2.60 <br />Map 155 <br />north of RDH -3 <br />B -Seam Dewatering System /SH -3 <br />4.30 <br />Map 157 <br />B -Vent Shaft #3 <br />0.88 <br />Map 156 <br />Alluvial Well Area & Access Road <br />1.80 <br />Maps 90 & 91 <br />Overland Conveyor Access - Maintenance Rd. ** <br />36.23 <br />Maps 106 -113 <br />Slot Storage Facility <br />8.00 <br />Map 105 <br />Halandras Trash Dump <br />12.40 <br />Map 136 <br />Return shafts <br />7.46 <br />Map 147,152,153 <br />Degas, development drilling, nitrogen injection <br />holes & rock dust facilities <br />121.15 <br />Map147,154,155, 158 <br />Staging /laydown areas <br />32.82 <br />Map 147 <br />TOTAL <br />851.72 <br />Notes: <br />* Total for mine life. <br />** The loadout tower and associated disturbances are included with the overland <br />conveyor. The tower is the terminus for the conveyor <br />system. <br />Minor Revision #158 (11/2013) V -24 <br />