My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-27_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2013-11-27_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:34 PM
Creation date
12/10/2013 10:07:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
11/27/2013
Section_Exhibit Name
Section III. Mine Description
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
revised mining sequence was prepared. Under this plan, in 1996, South Mains Right was further <br />developed to provide access for room - and - pillar panel RP -1, all longwall gateroads were developed <br />and mining of RP -1 and RP -2 occurred. In 1997, RP -1 and RP -2 were mined out and mining of LW -10 <br />resumed. LW -11 and LW -12 were subsequently mined out and the D -seam sealed in 2000. <br />Development work in the B -seam started in 1997. Longwall mining of the B -seam started in 2000 with <br />LW -1 B. Additional longwall panels are mined as resources are depleted. <br />All the water produced outby the sealed area, from mining as well as natural ground water will be <br />pumped into the mined out and sealed D -seam. Therefore, no surface discharge of this water is likely <br />in the near future. There will be no effects to existing ground water due to storage in these areas. <br />III.A.4 Mining Equipment Because a mixed mining method is planned for the Deserado Mine, two <br />different equipment systems are required, one set for longwall mining and several sets for room and <br />pillar mining. <br />The longwall equipment consists of a shear to cut the coal and an armored conveyor to transport the <br />coal to a stage loader which loads the coal onto the longwall panel conveyor. Shield -type supports are <br />used to provide roof support in the immediate face areas. <br />The room and pillar equipment consists of continuous miner units, each containing a continuous miner, <br />two shuttle cars, one roof bolter and a scoop. <br />Although the coal seams are not expected to produce significant amounts of groundwater, the mine <br />drainage system is designed to dewater the mine quickly enough to prevent any safety hazard to <br />workers or equipment. <br />III.A.5 Roof Control The roof control plan, which has been submitted to and approved by the Federal <br />Mine Safety and Health Administration (MSHA) contains the following provisions: <br />• Entries will be driven on 20 to 150 -foot centers, cross cuts on 50 to 220 -foot centers. <br />Entries and crosscuts will be 16 -22 feet wide. Full extraction may be practical during room <br />and pillar mining. <br />Permit Revision #8 (02/2013) III -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.