My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-27_PERMIT FILE - C1981018A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981018A
>
2013-11-27_PERMIT FILE - C1981018A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:34 PM
Creation date
12/10/2013 10:07:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018A
IBM Index Class Name
Permit File
Doc Date
11/27/2013
Section_Exhibit Name
Section III. Mine Description
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• topsoil material is salvaged from the mud pit areas and placed in the topsoil stockpile. The mud <br />pits are about 20' x 10' x 6'. Any runoff water and/or water/drilling mud mixture is generally <br />collected in the mud pit. The mud pits effectively serve as the sediment control structures for the <br />disturbance during drilling. Sediment control of the drill pad areas is achieved by various methods <br />described in Illustration 44. See Illustration 44 "Typical Borehole, Exploration, and Shaft Pads", <br />"Drill Sites - Gentle Slopes", and "Drill Sites with Good Cover". During the grazing period from <br />December 1 through April 15, the mud pits will be left in a reasonably dry condition so they do not <br />pose a hazard to sheep. <br />Upon successful drilling and hole completion, the overburden from the mud pits is backfilled and <br />smoothed out. The disturbed area (drill site and mud pits) is ripped to a minimum depth of one <br />foot below grade prior to topsoil replacement. Stockpiled topsoil is spread evenly back over the <br />disturbed site. Sediment control of the disturbed area will be maintained during revegetation <br />according to the measures described above. Drill site seed mix, shown in TableV-10, is broadcast <br />seeded and raked in. Access to the hole is necessary to monitor the success of the de-gassing <br />effort. Access roads used during drilling and monitoring of vent holes will be scarified and <br />reseeded next fall after such access is no longer required. <br />III.A.9 Underground Transportation Rubber tired vehicles are used to carry personnel and <br />supplies from the surface to the underground mining area. <br />Coal is transported from the working areas by belt conveyors. The slope conveyor delivers the <br />coal to the surface coal handling facilities. <br />III.B Surface Support Facilities <br />Before the run-of-mine (ROM) coal can be shipped to the power plant, all or part of it is processed <br />in a preparation plant to remove some of the impurities. Coal handling and preparation facilities <br />have been constructed in the SE1/4, Sec. 4, T2N, R101 W (Maps 1 and 2). <br />III.B.1 Coal Handling and Storage The ROM coal is transported out of the mine portal on a <br />54-inch conveyor belt. A series of conveyors then transport the coal through the various storage <br />and preparation facilities. All conveyors are partially covered or totally enclosed to reduce dust <br />emissions and protect the belt from the weather. ROM coal is delivered directly to the rotary <br />breaker. <br />0 Minor Revision #140 (7/2009) 111-28
The URL can be used to link to this page
Your browser does not support the video tag.