My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-09_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2013-12-09_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:55 PM
Creation date
12/10/2013 8:27:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
12/9/2013
Doc Name
Adequacy Review Letter & Cost Estimate
From
DRMS
To
Twentymile Coal Company
Type & Sequence
MR270
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary of MR270 Tasks <br />Site: Foidel Creek Mine Permit Action: MR270 Permit /Job #: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 12/9/2013 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C056 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />Plug and Seal 7RT Thickener Underflow Borehole <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />1 <br />4.00 <br />$2,748.32 <br />$2,279.59 <br />$834.36 <br />$1,265.54 <br />$329.62 <br />Regrade Drill Pad, Mud Pits, and Pipeline Corridor <br />DOZER <br />11.15 <br />Replace Topsoil on Borehole Pad and Pipeline <br />Corridor <br />DOZER <br />4.08 <br />Reseed 1.75 acres disturbance <br />REVEGE <br />2.00 <br />Demolish and Remove Structures <br />DEMOLISH <br />2.00 <br />SUBTOTALS: <br />23.23 <br />$7,457.43 <br />INDIRECT COSTS <br />6]0 aR:I D1_\ D7_llâ–ºIII Ci.Zf) 011 <br />Liability insurance: 2.02% <br />Total = <br />$150.64 <br />Performance bond: 1.05% <br />Total = <br />$78.30 <br />Job superintendent: 2.00 hrs <br />Total = <br />$130.82 <br />Profit: 10.00% <br />Total = <br />$745.74 <br />TOTAL O & P = <br />$1,105.50 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$8,562.93 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />0.00% Total = <br />$0.00 <br />Reclamation management and /or administration: <br />0.00% <br />$0.00 <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$1,105.50 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$8,562.93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.