My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-07_PERMIT FILE - C1981025A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981025
>
2013-10-07_PERMIT FILE - C1981025A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:11 PM
Creation date
12/10/2013 8:27:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025A
IBM Index Class Name
Permit File
Doc Date
10/7/2013
Doc Name
Final Engineering Calculations
Section_Exhibit Name
4.0 Appendix 4-B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• DIVERSION DITCH ABOVE TREATMENT PONDS T-1 AND T-2 4/6 <br /> PEAK FLOW CALCULATIONS <br /> T-1 & T-2 T-1 & T-2 <br /> DIVERSION DIVERSION <br /> SITE ACCESS ROAD <br />DRAINAGE AREA (ACRES) 2.79 0.24 <br />CURVE N0. 70 82 <br />STORM EVENT YR., 24 HR. 25 25 <br />STORM EVENT in. 2.2 2.2 <br />RUNOFF in. 0.320 0.784 <br />WATERSHED RELIEF ft. 58 <br />Lc 25 ft. 450 <br />Lc 50 ft. 360 <br />Lc 75 ft. 225 <br />WATERSHED SLOPE 12.3 12.3 <br />SLOPE ADJUSTMENT FACTOR 0.97 0.97 <br />LENGHT OF WATERSHED 380 380 <br />EQUIVALENT DRAINAGE AREA 2.71 2.71 <br />PEAK FLOW cfs/in Fig D-2 4.2 0.29 <br />ADJUSTED PEAK FLOW 1.34 CFS 0.02 CFS <br />TOTAL DESIGN FLOW 1 .36 CFS <br />• DIVERSION DITCH ABOVE T-1 AND T-2 PONDS <br />FLOW IN A TRIANGULAR CHANNEL <br />DEPTH D 0.700 FEET <br />SLOPE S 0.010 EXPRESS AS DECIMAL <br />MANNINGS "N" N 0.030 EXPRESS AS DECIMAL <br />SIDE SLOPE X 1.500 SLOPE = X:1 <br />AREA=(W*D)+(X*D^2)= 0.74 FEET^2 <br />WETTED PERIMETER=(W)+2((XD^2+ D^2))^.5 2.52 FEET <br />R=AREA/WETTED PERMITER 0.29 <br />V=(1.49/N)*(R^.667)*(S^.5)= 2.18 FEET/SEC <br />Q = A X V = 1.60 CFS <br />Q REQUIRED 1.36 <br />The diversion ditch will be a triangular cha nnel 0.7 <br />feet deep with 1.5h: 1v side slopes. With a freeboard of 0.3' <br />the total depth of t he upper diversion ditch is 1.0 foot. <br />The flow velocity is slow en ough that erosio n will not be a <br />problem. <br />• <br />P-9-8 <br />08-14-95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.