Laserfiche WebLink
• LONG POND 2/6 <br />RUN-OFF VOLUME - - LONG POND <br /> PRECIP DIRECT RUN-OFF <br />ACREAGE CURVE AMOUNT RUN-OFF VOLUME AF <br />0.92 78 2.2 0.60 0.05 <br />1.16 70 2.2 0.32 0.03 <br />TOTAL REQUIRED WATER VOLUME FROM RUN-OFF 0.077 <br />SEDIMENT VOLUME <br />Not applicable to this sizing calculation. The pond is <br />designed to accumulate sediment from the water treatment <br />process. <br />25-YEAR STORM RUN-OFF CONTAINMENT <br />Design the long pond embankment to contain the run-off from <br />the 25 year event. The surface area of the long pond is <br />calculated as follows: The station measurement is taken <br />beginning on the east (inlet) end of the pond. <br />Station Width Surface Area <br />0 27 0.029 <br />50 23 0.026 <br />100 22 0.026 <br />• 150 <br />200 23 <br />22 0.026 <br />0.023 <br />250 18 0.022 <br />300 20 0.025 <br />350 24 0.018 <br />385 20 <br />TOTAL 0.194 Acres <br />The run-off from the 25 year event would increase the water <br />level in the long pond 0.40 feet, .077 A-F/ 0.194 Acres. <br />Design the long pond embankment so it has 0.50 feet <br />of additional freeboard to contain this run-off. Therefore <br />the long pond will have 1.5 feet of freeboard above the <br />emergency spillway. <br />LONG POND SPILLWAYS <br />The maximum expected flow from the No. 1 & No. 3 Mine seepage <br />is 70 gpm. Since the long pond embankment will be designed <br />to contain the run-off from the 25-year event, the emergency <br />spillway must only pass the 70 gpm flow. <br />• P-9-6 <br />08-14-95 <br />