Laserfiche WebLink
_• APPENDIX 4-B <br />NARRATIVE, EXPLANATION AND CERTIFICATION <br />The majority of the information contained in Appendix 4-B is no <br />longer applicable to the reclaimed North Thompson Creek mine sites <br />or unit train loadout haul road. The following narrative will <br />explain the current status of the drainage control at the mine <br />sites and unit train loadout haul road. <br />No. 3 Mine Site <br />The reclaimed No. 3 Mine does not have any design ditches or <br />culverts within the reclaimed area. The drainage control features <br />presented on Map D-4-7 including ditch D-1 and culverts C-7 and C-8 <br />have been reclaimed. The only ditch associated with the reclaimed <br />No. 3 mine site is ditch D-2A. Ditch D-2A conveys run-off from the <br />reclaimed No. 3 mine area and the undisturbed area above (drainage <br />area 10) to the east. <br />Water Tank Area <br />The water tank disturbance does not have any design ditches or <br />culverts within the reclaimed area. The drainage control features <br />presented on Map D-4-7 including ditch D-3, culverts C-3, C-5, C-9, <br />C-10 and pond P-2 have been reclaimed. Ditch D-2B conveys runoff <br />• from the water tank reclaimed area and the undisturbed area above <br />(drainage area 7 and ~ of 6) to the east. <br />No. 1 Mine Area <br />The reclaimed No. 1 Mine does have a few design ditches and <br />culverts within the reclaimed area. However the drainage control <br />features presented on Map D-4-8 including culverts C-11 and C-12 <br />have been reclaimed. Ditch D-4 collects water along the south <br />boundary of the reclaimed site and conveys the water to pond P-9. <br />The basis for the design flow for this ditch is the design flow for <br />the emergency spillway for pond P-9 which is presented in this <br />appendix on page P-9-2. <br />Ditches D-6 and D-7 convey the run-off from the undisturbed areas <br />above the mine site to pond P-4 where it is conveyed under the <br />county road by culvert C-6. Ditch D-7 is the upper diversion ditch <br />for the refuse pile so it is designed to handle the run-off from <br />the 100-year event (drainage areas 3A, 3B and 4). Ditch D-6 is <br />designed to handle the run-off from the 10 year event (drainage <br />areas 3A, 3B, 4, SA, SB and ~ of 6). The design for ditches D-6 <br />and D-7 is presented on pages 4-B:5 & 6. <br />Ditches D-9 and D-10 convey the run-off away from the refuse pile. <br />The design for these ditches is presented in a section of this <br />• appendix titled; Snowmass Coal Company, Mid-Term Review Response, <br />4-B:1 October 1994 <br />