Laserfiche WebLink
~r~; TABLE OF CONTENTS <br /> Page <br /> 4.3,2 Operational Plan for the Loadout .4-26 <br /> 4.3.2.1 Production Methods and Equipment. .4-26 <br /> 4.3.2.2 Operation Description .4-27 <br /> 4.3.2.3 Loadout Facilities. .4-27 <br /> 4,3.2.4 Ponds, Impoundments and Diversions. .4-38 <br /> 4.3.2.5 Topsoil Removal, Handling and Storage .4-39 <br /> 4.3.2.6 Coal and Non-Coal Processing Waste. .4-40 <br /> 4.4 Reclamation Plan . .4-41 <br />' 4.4.1 General. .4-41 <br /> 4.4.2 Mine .4-41 <br /> 4,4.2.1 Reclamation Timetable .4-41 <br /> 4.4.2.2 Interim Reclamation .4-42 <br /> 4.4.2.3 Final Reclamation .4-46 <br /> 4.4.2.4 Mine Reclamation Cost Estimate. .4-69 <br /> 4.4.3 Loadout. .4-74 <br /> 4.4.3.1 Reclamation Timetable .4-74 <br /> 4.4.3.2 Interim Reclamation - Loadout .4-74 <br /> 4.4.3.3 Final Reclamation <br />~ ,4-85 <br /> 4.4.3.4 Loadout Reclamation Cost <br />Estimate .4-91 <br /> 4.5 Postmining Land Ilse .4-95 <br /> 4.5.1 Mine ,4-94 <br /> 4.5.2 Loadout. .4-99 <br /> 4.6 Mitigation of Coal Mining Operation Impacts .4-101 <br /> 4.6.1 Mine .4-101 <br /> -~ 4.6,1.1 Air Pollution Control Plan. .4-101 <br /> 4.6.1.2 Fish and Wildlife Plan - Mine .4-101 <br /> ""'4.6.1.3 Protection of the Hydrologic Balance. .4-103 <br /> 4.6.1.4 Protection of Public Parks and <br /> Historic Places .4-128 <br /> _ <br />4.6.1.5 Subsidence. .4-128 <br /> 4.6.2 Loadout. .4-129 <br /> 4.6.2.1 Air Pollution Control Plan. .4-129 <br /> 4.6.2.2 Fish and Wildlife Plan. <br />~ .4-130 <br /> 4.6.2.3 Protection of the Hydrologic <br />Balance. .4-132 <br /> 4.6.2.4 Protection of Public Parks and <br /> Historic Places .4-143 <br /> 5.0 SPECIAL CATEGORIES OF MINING .5-1 <br /> 5.1 Prime Farmland. .5-1 <br /> 5.1.1 Mine .5-1 <br /> 5.1.2 Loadout. .5-1 <br /> 5.2 Alluvial Valley floor .5-3 <br /> 5.2.1 Mine .5-3 <br /> 5.2.2 Loadout. .5-13 <br /> <br />