My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-06_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2013-12-06_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:52 PM
Creation date
12/10/2013 8:01:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
12/6/2013
Doc Name
Adequacy Letter & Cost Estimate (Emailed)
From
DRMS
To
Scott Wanstedt
Type & Sequence
MR157
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reseed Disturbance from Topsoil Pile <br />Site: Deserado Mine Permit Action: MR157 Permit /Job #: C1981018 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 12/6/2013 County: Rio Blanco <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C018 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />Reseed Disturbance from Topsoil Pile <br />REVEGE <br />1 <br />1.52 <br />$114.58 <br />SUBTOTALS: <br />1.52 <br />$114.58 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Total = <br />$2.31 <br />Performance bond: 1.05% <br />Total = <br />$1.20 <br />Job superintendent: 0.76 hrs <br />Total = <br />$49.71 <br />Profit: 10.00% <br />Total = <br />$11.46 <br />TOTAL O & P = <br />$64.68 <br />CONTRACT <br />AMOUNT (direct + O & P) = <br />$179.26 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.25% <br />Total = <br />$7.62 <br />Reclamation management and /or administration: <br />5.00% <br />$8.96 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$81.26 <br />TOTAL BOND AMOUNT (direct + indirect) = $195.84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.