Laserfiche WebLink
Table 1. Summary of Past Bond Releases /Acreage Changes at Trapper Mine <br />Submittal <br />Proposed <br />Decision <br />Date(s) <br />Released <br />Area <br />Ph I <br />(acres) <br />Released Area <br />Ph II <br />(acres) <br />Released Area <br />Ph III <br />(acres) <br />Reduction in <br />Liability <br />SL -01 <br />12- Feb -98 <br />(Ph I) <br />14- Dec -98 <br />(Ph II) <br />2,511.70 <br />1,548.00 <br />0 <br />0 <br />$0.00 <br />$0.00 <br />SL -02 <br />23- Dec -99 <br />0 <br />319.5 <br />0 <br />$0.00 <br />SL -03 <br />19- Apr -02 <br />0 <br />592.7 <br />0 <br />$0.00 <br />SL -04 <br />18- Nov -03 <br />0 <br />0 <br />1,857.70 <br />$82,659.00 <br />SL -05 <br />11- Jun -04 <br />823.9 <br />0 <br />0 <br />$0.00 <br />SL -06 <br />6- Sep -05 <br />0 <br />819.6 <br />0 <br />$2,587,606.00 <br />SL -07 <br />16- May -06 <br />0 <br />0 <br />762.8 <br />$371,146.00 <br />SL -08 <br />21- Nov -08 <br />476.6 <br />0 <br />0 <br />$0.00 <br />SL -09 <br />2- Dec -08 <br />0 <br />294.6 <br />0 <br />$898,333.00 <br />SL -10 <br />17- Nov -08 <br />0 <br />0 <br />305 <br />$228,664.00 <br />SL -11 <br />7- Jan -11 <br />57.8 <br />0 <br />0 <br />$0.00 <br />SL -12 <br />27- Mar -12 <br />165.5 <br />$695,081.66 <br />SL -13 <br />27- Mar -12 <br />323.5 <br />$238,793.10 <br />TR109 <br />Additions <br />24- Aug -12 <br />5.2 <br />$0.00 <br />TR109 Re- <br />Disturbance <br />24- Aug -12 <br />-24.8 <br />-17.5 <br />-5.9 <br />$0.00 <br />TRIII Re- <br />Disturbance <br />24- Apr -13 <br />-10.4 <br />-4.6 <br />$0.00 <br />SL -14 <br />5- Dec -13 <br />417.8 <br />$2 397 358.49 <br />Total Areas <br />4,252.60 <br />3,723.00 <br />3,243.10 <br />-Phase II Bond Release Acreage for SL6 was increased to 819.6 due to a typo in the SL6 findings document. <br />-TR109 Additions; a 5.2 acre parcel was added to the total Phase II release acreage. This acreage is associated <br />with Parcel A -B -98, this area obtained Phase III release during SL10, however this area was never part of a Phase <br />II release approval. <br />-TR109 Re- disturbance; Trapper has re- disturbed acreage that has been phase I, II and III bond released over the <br />years. Part of TR109 was a requirement to update the total bond release acreage to account for this disturbance. <br />Trapper Mine Page 4 December 2013 <br />SL -14 Phase I Bond Release <br />