Laserfiche WebLink
PERMIT #: M- 1977 -151 <br />INSPECTOR'S INITIALS: PSH <br />INSPECTION DATE: November 15, 2013 <br />The Division currently holds a financial warranty in the amount of $47,000, which appears adequate to <br />complete the surface reclamation on the site. The mine sign and boundary markers as required by Rule 3.1.12 <br />were observed during the inspection. The Operator has constructed boat docks and other structures along <br />the lake shorelines to accommodate the water skiing activities. The Division will require the Operator to <br />submit a technical revision to include these features into the approved Reclamation Plan for the site prior to <br />any future release request consideration by the Division. <br />The shoreline vegetation consisted of annual weeds with little to no native grasses. The shorelines with the <br />exception of the beach areas constructed for the water skiers appeared steeper than the required 3H:1V <br />slopes. The Operator stated in the 2013 Annual Report shoreline regrading occurred along the southern and <br />northwest edges of the 40 acre lake. The Division recommends the Operator continues to regrade the non- <br />compliant slopes and begin revegetation of the completed shorelines. Stockpiles of concrete were observed <br />along the southern shoreline of the 40 acre lake. The Operator will need to comply with the requirements of <br />Rule 3.1.5(9) if the concrete is used as inert fill at the site. <br />Photographs taken during the inspection are attached. <br />Inspection Contact Address <br />Mrs. Sharon Hiner <br />R M Hiner Construction Co Inc <br />11 Austin Rd <br />Lamar, CO 81052 <br />Cc: Tom Kaldenbach, DRMS <br />Page 3 of 6 <br />