Laserfiche WebLink
Oct 31 2013 7:34PM <br />HP LRSERJET FAX <br />570- 276 -2002 <br />p.2 <br />(iCC��CIL,YJ7i(7C°'C /•rC'V� Page2o0 <br />112c Annual Report <br />Permittee Name: <br />4B Land & Livestock LLC j <br />Permit Number: <br />M -2008 -022 <br />Operation Name: <br />Breeze Basin Sand & <br />Gravel Pit <br />County: <br />Moffat <br />Annual Fee Due: <br />$791.00 TAnniversary <br />Date: <br />December 4, 2013 <br />Permit Acre <br />62.00 1 <br />Current Bond Amt. <br />$47,810.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any now disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. <br />Is the site identification sign posted in accordance with Rule 3.1.12(1), <br />NO <br />2. <br />is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />NO <br />3. <br />is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />"YES," <br />YES <br />w /topsoil <br />If please note time limits related to completion of reclamation, Rule 3.1.3. <br />ulched w/ <br />[approved <br />4. <br />What was the date of last excavation, processing or hauling activity at the mine? <br />.Z y/ j <br />5. <br />Does the mine operate more than 180 days per year? <br />/� NO <br />Total acres <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />Total acres <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />YES CO <br />graded: <br />b) approval for INTERMITTENT OPERATION? <br />YES <br />7. <br />Number of acres currently affected (mining 4 incomplete and or unreleased reclamation), <br />Z -Z- <br />8. <br />Number of acres that were newly affected during the current report year. <br />-C� - <br />9. <br />Number of acres that were reclaimed during the current report year. <br />-0- - <br />10. <br />Estimated new acreage to be affected in the next report year. <br />- �- <br />11. <br />Estimated acres to be reclaimed in the next report year. <br />.� <br />12. <br />Total acres in various stases of rarimmntinn tint.. »d% mItfna L -_ -_ . <br />Tom acres <br />Tlc)w acres <br />Total acres <br />otal acres <br />bacld"illed: <br />z <br />seeded w/ _._. <br />w /topsoil <br />_ _ <br />ulched w/ <br />[approved <br />approved mix: <br />replaced: <br />mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />�, <br />.� <br />fertilized w/ <br />replacemen <br />replacement <br />L� <br />rate (tons/ac): <br />a vd fertilizer <br />depth (in,).. <br />—` <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />