Laserfiche WebLink
Interoffice Memorandum <br />Refuse Pile — RPE and RPEE <br />Percent slope was measured for both the final configuration of RPE and the ongoing refuse placement of RPEE. Percent <br />slope for RPE matches that which is permitted. When measuring the percent slope of RPEE it was found to be roughly <br />9% steeper than what is permitted. It is unknown to me whether this section of the refuse has met final configuration or <br />not. <br />Conclusion <br />From my review of the RPE, RPEE and associated structures, there is no significant difference between our field <br />measurements to that of the approved dimensions of each structure except for the percent slope of the refuse for RPEE. <br />It would be good to know if this section of the refuse pile has met final configuration or if construction is still ongoing. I <br />would also recommend additional and more accurate measurements be taken of the refuse pile to ensure our current <br />field measurements are correct. The use of a handheld rangefinder can lead to the discrepancy between our <br />measurements and what is permitted. <br />If you have any questions, feel free to contact me. <br />Sincerely, <br />Zach Trujillo <br />