1.1.2 Akmiloring TYell Design, Installation, Development, and Repos-ling <br />A hydrologist or geologist will prepare monitoring well specifications and designs. All new wells w ill be <br />installed and developed by a licensed water well drilling contractor under the direct supervision of Cotter <br />or their consultants. Final well depths, screened intervals, filter pack, and other relevant well construction <br />features will be determined in the field by the supervising engineer or geologist. <br />Monitoring wells will be drilled using an air rotary rig and environmental grade thread lubricant (pipe <br />dope). Injected water or drilling foam may be used during drilling to suspend and remo\ e cuttin"'s from <br />the boring. The borehole diameter will be a minimum of 6.5 inches and the monitoring wells will be <br />completed using 2 -inch ID, flush - threaded, Schedule 80 PVC and 0.02 -inch (20 -slot) factory slotted PVC <br />screen. A 5 -ft sump (blank casing) will be installed below each screen. <br />The annulus of each shallow well will be filled with 10 -20 Colorado silica sand that is tremied into place <br />to 10 ft above the screen, followed by a 10 -ft seal of bentonite chips or coated pellets. The filter pack will <br />be mechanically agitated and settled prior to installing the bentonite pellet plug. A high - solids bentonite <br />grout will be tremied into the annulus from the pellet plug seal to 20 feet below ground surface. The <br />Lipper 19 ft of annular space will be filled with Portland cement. The surface completion will include a <br />locking steel well cap set in a concrete pad that slopes slightly away from the well. All well locks will be <br />keyed alike using keys provided by Cotter or their consultants. <br />Well drilling and construction must follow standard practices for environmental monitoring wells <br />(including non - metallic environmental pipe dope on drill rods and wearing clean latex or nitrile gloves <br />while handling casing). An example monitoring well completion diagram is provided in Figure 2. <br />Monitoring wells will be thoroughly developed to remove residual drilling fluids or mud. Well <br />development will be conducted by airlifting from above the screen and surging within the screened zone <br />using a double surge block. <br />The supervising hydrogeologist or geologist will monitor the discharge water during well development. <br />Wells will be developed until field parameters (temperature, pH, and conductivity) are stable and the <br />discharge water is clear and free of sediment. <br />Detailed geologic logs and construction diagrams will be prepared for each new well. The logs will <br />include information on geologic conditions, boring depth, drilling conditions, depth to groundwater, and <br />well construction (depth, screened interval, screen slot size, filter pack type and interval, well seal type <br />and interval, and other pertinent information). All required forms will be submitted to the Colorado <br />Division of Water Resources including Form 51 Notice of Intent to Construct Monitoring Hole(s) and <br />Form 46 Monitoring /Observation Water Well Permit Application with the applicable filing fee per well. <br />1.1.3 Groundwater Sampling Equipment <br />It is anticipated that a bailer will be sufficient to remove three well volumes and obtain a groundwater <br />sample for the compliance well based on experience with the existing monitoring well. The background <br />well will be approximately 600 feet deeper than the existing well or the proposed compliance well. A <br />bailer will be tried for purging and sampling but it may be necessary to install a submersible sampling <br />pump to obtain reliable water samples. Grunfos pumps are designed for 2 -inch wells and can used to <br />purge and sample the well or for micro -purge sampling where low flow rates (approx.. 100 mUmin) <br />capture ambient flow through the well and eliminate the need for well purging and disposal of purge <br />water. <br />