Laserfiche WebLink
Legend NOV 2013 <br />Groundwater Monitoring Surface Water (Data <br />Well (Data Collected on 90 Collected June 18, 2013) <br />July 23, 2013) <br />- — EC Contours <br />Figure 3.5 <br />Climax Mine - <br />Eagle Park Catchment - <br />Electrical Conductivity Field Parameters <br />Climax Molybdenum Company <br />Drill Sample (Data <br />Collected Sept. 18 -20 <br />Drill Sample (Data <br />Collected on Aug. <br />2013) <br />19 -21, 2013) <br />Hand Auger Sample (Data <br />Groundwater (Data <br />Collected Sept. 19, 2013) <br />Collected June 18, 2013) <br />Groundwater Monitoring Surface Water (Data <br />Well (Data Collected on 90 Collected June 18, 2013) <br />July 23, 2013) <br />- — EC Contours <br />Figure 3.5 <br />Climax Mine - <br />Eagle Park Catchment - <br />Electrical Conductivity Field Parameters <br />Climax Molybdenum Company <br />