Laserfiche WebLink
Mr. Michael Cunningham <br />CDRMS <br />November 26, 2013 <br />diversions, and vegetative filters for overland flow discharges. All areas <br />disturbed by construction will be temporarily re- vegetated or graveled and <br />maintained as soon as practical. <br />(1) Nature of Milling Activities at the Site <br />The Mill is a custom ore processing facility. Ore will be routinely delivered to <br />the facility. Ore will be processed at a maximum production rate of 200 tons <br />per day. Ore will be conveyed to the crusher, then through a series of <br />processes to produce concentrates. These concentrates will be shipped off <br />site for further processing. The process tailings will be pumped to a CDRMS <br />approved TSF. The TSF is located adjacent to the Mill. The Mill will be <br />operated and or maintained 365 days a year -24 hours a day, 7 days a week. <br />(2) Design Parameters <br />Once the CDRMS permit is issued, the following construction activities will <br />commence. Based on- Wilkes, S.G and Erke C. King, 1975. Procedures for <br />Determining Peak Flows in Colorado— Soil Conservation Service: <br />Install BMPs on access road from Highway 24; <br />Install or repair other BMP structures; <br />Improve or construct structures on the preexisting access road <br />including berms, swales, debris basins, and ditches using the <br />following design criteria and methods; <br />• Drainage Area: 20.7 acres (entire property). <br />• Runoff Coefficients. Undisturbed forest Runoff Coefficient <br />Number (RCN) = 60. <br />• 10-yr,and 100 -yr 24hr Stormwater Events. The estimated <br />peak flows from the 10 -year, 24 -hour (0.54cfs) and 100 -year, <br />24 -hour storm event (3.Ocfs) are presented in Attachment 7. <br />The peak flows were calculated assuming a RCN =60, a <br />drainage area of 20.7ac, the disturbed area is internally <br />drained, Lodgepole Pine vegetative coverage is approximately <br />40 %. <br />• Drainage Channel Configuration (Stormwater Diversion). <br />Stormwater for the 100 -year, 24 -hour storm event of 4.25cfs <br />will be conveyed around the disturbed area in a ditch that has <br />1:1 side slopes that is at least 1.25ft deep constructed on a <br />slope less than 5 %. The drainage basin configuration, flow <br />estimates and assumptions are presented in Attachment 7. <br />Existing 12in culverts will convey the peak flow from the 100 - <br />year -24 -hour storm with a flow through velocity estimated to <br />be approximately 8.Ofps. <br />o Affected Area: (Estimate of total affected area, and <br />area /location expected to be disturbed by clearing, excavation, <br />grading or other construction activities). <br />• The mill permit area occupies approximately 10.Oac; <br />• The TSF occupies an area approximately 3.Oac; <br />