My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-27_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2013-11-27_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:28:46 PM
Creation date
11/29/2013 10:17:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
11/27/2013
Doc Name
Extension Request Amendment Review no 1
From
The Union Milling Company
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 5 -1 Reclamation Cost Estimate <br />Task 7 Mobilization & Demobilization <br />Mobilize and demobilize reclamation equipment at site. <br />a) Bring all necessary reclamation equipment to site, and remove when work is done. <br />b) Rates consistent for mob /demob activities. <br />Assumptions <br />ATTACHMENT 6 <br />November 22, 2013 <br />Parameter <br />Value Unit <br />Rate Cost <br />$/hr $ <br />Notes <br />One -Way Travel Distance <br />5.0 mile <br />$103.97 $1,941 <br />Equipment will originate from prior job site <br />Average Travel Speed <br />15 mph <br />$50.00 $33 <br />In town driving only. <br />Load /Unload Time <br />1 hr <br />$50.00 $33 <br />Applies only to non- roadable equipment <br />Mob /Demob Time - Roadable Equip <br />0.67 hr <br />$50.00 $33 <br />per unit time to mob /demob <br />Mob /Demob Time - Non - Roadable Equip. <br />4.67 hr <br />I <br />I <br />1per unit time to mob /demob <br />Cost Estimate <br />Unit <br />Round <br />Trips <br />Rate Cost <br />$/hr $ <br />Notes <br />Tractor /Lowboy <br />4 <br />$103.97 $1,941 <br />Rental rates include labor and typical <br />Front -End Loader, 3.5yd3 <br />1 <br />$50.00 $33 <br />contractor margins. <br />Bulldozer, <br />1 <br />$50.00 $33 <br />Water Truck <br />1 <br />$50.00 $33 <br />Boom Truck <br />1 1 <br />$50.00 $33 <br />Mobilization Demobilization Cost <br />I <br />i <br />1 $2,074 <br />RECLAMATION COST ESTIMATE <br />Union Milling Company, LLC 6 of 6 <br />MillReclamationCost 005nm -a <br />
The URL can be used to link to this page
Your browser does not support the video tag.