Laserfiche WebLink
0 <br />February 12, 1999 <br />STIPULATIONS <br />FOR <br />EXISTING ACCESS ROADS <br />FOR <br />JIM YUST AND JEANNE OFF <br />C -62471 AND C -62475 <br />►_J <br />EXHIBIT "A" <br />The holder shall contact the authorized officer at least 4 (four) days <br />prior to the anticipated start of construction and /or any surface <br />disturbing activities. The authorized officer may require and schedule a <br />preconstruction conference with the holder prior to the holder's <br />commencing construction and /or surface disturbing activities on the right - <br />of -way. The holder and /or his representative shall attend this <br />conference. The holder's contractor, or agents involved with construction <br />and /or any surface disturbing activities associated with the right -of -way, <br />shall also attend this conference to review the stipulations of the grant <br />including the plans(s) of development. <br />The holder shall submit a plan or plans of development that describe in <br />detail the construction, operation, maintenance, and termination of the <br />right -of -way and its associated improvements and /or facilities. The <br />degree and scope of these plans will vary depending upon (1) the <br />complexity of the right -of -way or its associated improvements and /or <br />facilities, (2) the anticipated conflicts that require mitigation, and (3) <br />additional technical information required by the authorized officer. The <br />plans will be reviewed, and if appropriate, modified and approved by the <br />authorized officer. An approved plan of development shall be made a part <br />of the right -of -way grant. <br />3. Testing of site 5GA2286 will need to be completed prior to any proposed <br />development on road segment L that would extend west and beyond twenty <br />feet of the road centerline to determine the potential for intact buried <br />cultural materials and eligibility of the site to the National Register of <br />Historic Places. <br />4. The holder shall conduct all activities associated with the construction, <br />operation, and termination of the right -of -way within the authorized <br />limits of the right -of -way. <br />5. When construction activity in connection with the right -of -way breaks or <br />destroys a natural barrier used for livestock control, the gap, thus <br />opened, shall be fenced to prevent the drift of livestock. The subject <br />natural barrier shall be identified by the authorized officer and fenced <br />by the holder as per instruction of the authorized officer. <br />6. The holder shall be responsible for weed control on disturbed areas within <br />the limits of the right -of -way. The holder is responsible for <br />consultation with the authorized officer and /or local authorities for <br />acceptable weed control methods (within limits imposed in the grant <br />stipulations) . <br />7. Use of pesticides shall comply with the applicable Federal and state laws. <br />Pesticides shall be used only in accordance with their registered uses and <br />within limitations imposed by the Secretary of the Interior. Prior to the <br />use of pesticides, the holder shall obtain from the authorized officer <br />written approval of a plan showing the type and quantity of material to be <br />used, pest(s) to be controlled, method of application, location of storage <br />and disposal of containers, and any other information deemed necessary by <br />