YUST RANCH GRAVEL PIT <br />EXHIBIT E <br />RECLAMATION PLAN <br />Yust Ranch Reclamation Plan is to reclaim the phases as the mining operations progress to the west. <br />The mining plan is broken out into four phases and upon receipt of the 112 permit, the operations will <br />move into phase 2 and reclamation of phase 1 (the existing 110 permit area) will begin. The high walls <br />will be laid back at a 3:1 backslope and topsoil will be placed at a minimum of 4" before grass drill <br />seeding the area. <br />Topsoil from stripping activities will be stockpiled and seeded along the sides of the individual phased <br />areas. Following mining activities, the soil will be placed on backslopes and the pit floor areas. The Soil <br />Conservation Service provided a plan for topsoiling and seeding that we will follow (attached). <br />Maximum disturbed area at any one time will be 10 acres. <br />Reclamation costs include backfilling, sloping and grading as well as topsoil and seeding. <br />YUST RANCH GRAVEL PIT <br />112 CONVERSION APPLICATION <br />M 2000 -014 Page 5 <br />