Laserfiche WebLink
11/27/13 State.co.us Executive Branch Mail - Fwd: Bowie No 2 C1996083 TR -83 - Adequacy Review <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver CO 80203 <br />303 ®866 ®3567 x 8111 <br />http : / /mining. state. co.us <br />---- - - - - -- Forwarded message ---- - - - - -- <br />From: Burgmaier - DNR, Susan <s an.b ierestate.co. us> <br />Date: Fri, Nov 15, 2013 at 11.42 AM <br />Subject: Bowie No 2 C 1996083 TR -83 - Adequacy Review <br />To: Jim Stover <jestover @bres n.net >, Bill Bear <BBearbowiereso ces.co <br />Cc: Alysha Hernandez - DNR <alysha.hernandezoa state.co. > <br />Jim and Bill - The Division does not have any adequacy concerns with TR -83 (expand material storage area <br />near B Portals), and you have reviewed the Division's cost estimate. The revision is ready to approve. I <br />mentioned earlier that, due to our concerns with the material balance for the gob piles (TR -77), we would be <br />waiting to approve this revision. I can approve the revision with the following stipulation: <br />The 14,000 cy of cover fill material approved to be moved from the B Portal storage area must be direct <br />hauled to, and used as permanent cover material for, regraded portions of Gob Pile #4. Material removed <br />from the B Portal storage area may not be mixed with or incorporated into the waste material. <br />Please let me know if this is acceptable to you, or if you would rather we continue to delay this revision <br />pending approval of TR -77. <br />No virus found in this message. <br />Checked by AVG - ` .avg.co <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th= 142958416e24b4b9 2/3 <br />