Laserfiche WebLink
Page 3 of 4 <br />13. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office <br />the State Engineer (Well Permit, S.W.S.P., and /or Permanent Augmentation Plan)? YES NO !A-, <br />14. Are all hazardous materials stored within approved spill containment structures? YES NO v <br />15. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring inform pn <br />annually? YES NO C NFA) <br />If "Yes ", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />16. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still <br />in place and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: <br />17. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred <br />during the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock <br />dumps, adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to <br />safeguard shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional <br />pages should be attached if needed. <br />l <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? <br />YES NO N/A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the report <br />map. <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOV <br />YES NO <br />If "NO ", please explain: <br />(N <br />Is the reserved topsoil vegetated /stabilized in accordance with Rule 3.1.9(1)? <br />YES NO /A <br />If "NO" please explain: <br />13. If exploration has exposed groundwater, is the site in compliance with the approved mining plan and Office <br />the State Engineer (Well Permit, S.W.S.P., and /or Permanent Augmentation Plan)? YES NO !A-, <br />14. Are all hazardous materials stored within approved spill containment structures? YES NO v <br />15. Does your NOI reclamation plan or Environmental Protection Plan require you to submit monitoring inform pn <br />annually? YES NO C NFA) <br />If "Yes ", please attach the required monitoring results to this Annual Report as required by Rule 1.15(1)(c). <br />16. As required by Rule 5.6(1)(g) submit with this report documentation to show that the Financial Warranty is still <br />in place and is adequate to fully reclaim the approved prospecting site disturbance(s). <br />FINANCIAL WARRANTY DOCUMENTATION ATTACHED: <br />17. Please use the space below to describe as required by Rule 5.6(1)(c) any new prospecting activity that occurred <br />during the preceding year, including the locations and number of new surface drill holes, mud pits, excavations, rock <br />dumps, adits, shafts, trenches, pits, roads and structures. If applicable, you must also describe the measures taken to <br />safeguard shafts, adits and other mine openings from unauthorized entry both during and after prospecting. Additional <br />pages should be attached if needed. <br />l <br />