Laserfiche WebLink
Table 2 <br />OPERATIONAL LOSSES <br />Evans #2 Pit <br />2013 Plan Year (Rev'd 5/31/2013) <br />(1) (2) (3) (4) <br />Plan Year <br />2013 <br />Month <br />Amount of <br />Aggregate <br />Production <br />(tons) <br />Water Lost <br />With Mined <br />Aggregate <br />(acre -feet) <br />Water Used <br />for Dust <br />Control <br />(acre -feet) <br />Total <br />Operational <br />Losses <br />(acre -feet) <br />April <br />10,400 <br />0.31 <br />0.02 <br />0.33 <br />May <br />10,000 <br />0.29 <br />0.03 <br />0.33 <br />June <br />10,100 <br />0.30 <br />0.04 <br />0.34 <br />July <br />13,100 <br />0.39 <br />0.04 <br />0.42 <br />August <br />14,200 <br />0.42 <br />0.04 <br />0.46 <br />September <br />11,000 <br />0.32 <br />0.03 <br />0.36 <br />October <br />12,200 <br />0.36 <br />0.03 <br />0.39 <br />November <br />0 <br />0.00 <br />0.01 <br />0.01 <br />December <br />0 <br />0.00 <br />0.00 <br />0.00 <br />January <br />2,400 <br />0.07 <br />0.02 <br />0.09 <br />February <br />6,200 <br />0.18 <br />0.02 <br />0.21 <br />March <br />10,400 <br />0.31 <br />0.02 <br />0.33 <br />Total <br />100,000 <br />2.94 <br />0.31 <br />3.25 <br />Notes: <br />(1) Projected mining provided by Fremont Paving & Redi -Mix. <br />(2) Column (2) times 2000 times 4% divided by 62.4 divided by 43,560. <br />(3) Based on 100,000 gallons total and monthly distribution from 2010 -2012. <br />(4) Equals the sum of Columns (2) and (3). <br />Deere & Ault Consultants, Inc. 59UM Evans #2 Pit \009 2013 SWSP RenewaMmended SWSP May 2013\2013 Evans #2 Pit Amended SWSP Tables 5_31_13.xls <br />