Laserfiche WebLink
DIVISION OF WATER RESOURCES <br />Paul Bruss <br />November 20, 2013 <br />Page 2 of 4 <br />Evaporative depletions have been calculated using the maximum surface area of the pit, <br />which is 29.9 acres. <br />Depletions have been lagged back to the Arkansas River as requested in the previous <br />SWSP approval letter., A Glover analysis was performed, using the following inputs: <br />Distance from river: <br />2975 ft (evap.: measured from centroid <br />Dewatering is measured from the edge of pit to river: <br />3726 feet (dewatering Pond 1) <br />3357 feet (dewatering Pond 2) <br />3203 feet (dewatering Pond 3) <br />2703 feet (dewatering Pond 4) <br />Distance from alluvial boundary: <br />7675 ft (evaporation) <br />8126 ft (dewatering Pond 1) <br />7657 ft (dewatering Pond 2) <br />8203 ft (dewatering Pond 3) <br />8303 ft (dewatering Pond 4) <br />Transmissivity: <br />71,000 gpd /ft <br />Specific yield: <br />0.2 <br />You have calculated the total lagged depletions to be 102.31 acre -feet (see attached Table <br />2). <br />REPLACEMENTS <br />Valco will continue to utilize a combination of leased water and historical ditch credits to <br />make replacements to the river. Two new leases were obtained to provide replacement supplies <br />during the 10 -month period of this SWSP from the Department of Corrections ( "DOC ") for 50 acre - <br />feet and the Upper Arkansas Water Conservancy District ( "UAWCD ") for 50 acre -feet. Other <br />replacement sources include Rocky Ford Ditch CU credits and any excess Canon City and Oil <br />Creek ( "CC&OC ") ditch credits not used for replacement water supplies at Valco's Canon City East <br />Pit. <br />Conditions of Approval <br />This substitute water supply plan is hereby approved pursuant to Section 37 -90- 137(11), <br />C.R.S., subject to the following conditions: <br />1. This SWSP shall be valid for the period of June 1, 2013 through March 31, 2014, unless <br />otherwise revoked, modified, or superseded by decree. Should an additional SWSP be <br />requested, such renewal request must be submitted to this office with the statutory fee of <br />$257 per gravel pit at least 45 days prior to the expiration date of this plan. <br />2. No more than 47.3 acres (29.9 acres of post -1981 exposure) of ground water may be <br />exposed at the Rocky Ford East Pit during this plan year without first obtaining an <br />amendment to the plan. The above acreage totals include any surface areas in ponds to <br />which de- watering water is delivered. Documentation of pond sizes may be required by the <br />Division Engineer in the form of an aerial photo evaluation or survey by a Professional Land <br />Surveyor during the plan year <br />3. The Applicant must provide a copy of both lease /purchase agreements mentioned <br />above to the State Engineer's Office and the Division Engineer as soon as possible. <br />