Laserfiche WebLink
cc <br />dw <br />WTI IM <br />No progress occurred during this reporting period. Progress is waiting on leveling mat construction and timber <br />connection placement. <br />II) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: Tree removal, production <br />drilling and blasting, VLF /PSSA Cut to Fill and compaction, HWY 67 construction, Underground remediation, clay <br />(SLF) processing. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample Numbers 62 thru 63 was obtained during this reporting period <br />DCF: Sample Numbers 30 thru 32 was obtained during this reporting period. <br />General Project Items <br />Meetings send Discussions: Continued groundwater seepage was noted entering into the draw on the northern slope of the PSSA <br />after the removal of saturated material. On October 215' 2013, discussions were held between AMEC, CC &V, and Ames personnel <br />resulting in a decision to place additional secondary underdrain extending from the primary underdrain in the PSSA floor to the former <br />Hwy 67 roadway in the draw where the seepage was encountered. The possible need for tertiary underdrain placement higher up in the <br />draw will be evaluated at a later time. <br />The Weekly Project Status meeting was not held on October 23,d between CC &V, Ames, CDOT and Amec so as not to <br />impede / interfere with paving operations on the Hwy 67 Realignment. <br />Sununaiy of Concerns: None <br />CC& V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Eric Lorenson Date: 10.26.13 <br />Tim Burkhard <br />Project Resident Manager <br />Ph: 505.975.8655 <br />Approved By- 6_1 / ! %r/ <br />Date: 11-6-13 <br />Date: 1% 7_1' 3 <br />Page 3 of 6 MLE2 WE 10.26.13.doc <br />