My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-11-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:25 PM
Creation date
11/22/2013 1:46:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/21/2013
Doc Name
Weekly CQA Reports- 10/26/13, 11/02/13 and 11/09/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�Cc:! <br />&V <br />LL I <br />amec6 <br />CRIPPLE CREEI{ & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. * * * *. * * ** 10.26.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 10.20.13 thru 10.26.13 <br />Ambient Temperature Ranges for reporting period: Weather conditions for reporting period_ <br />Low: 21 *F — 35 °F Cloud Cover: Clear to partly cloudy <br />High: 43 °F — 57 °F Precipitation: None <br />Wind: Calm to gusts at times <br />Ames: Continuing construction tasks for HWY 67 and VLF. <br />Planning: Continuing construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) Earthworks <br />A) VLF (Phase 1) <br />Topsoil / Overburden Stripping: No topsoil / overburden stripping activities occurred during this reporting period <br />within the VLF limits. <br />Production drilling: Occurred during this reporting period within the planned VLF limits. <br />Five production blasts' occurred during this reporting period within planned VLF limits. <br />Structural Fill: The contractor continued fill operations and compaction by method specification for the ADR haul <br />road, the Dump 4 buttress fill, and the PSSA Toe Berm. <br />Structural fill materials were placed and compacted for the ADR haul road. A Cat D9T was used to spread the loose <br />lifts and compaction was achieved utilizing a Cat CS56 smooth drum roller by method specification and any <br />oversized material was broken with a Cat excavator hammer -hoe. <br />Structural fill materials were placed and compacted at the PSSA toe berm. A Cat D8T was used to spread the loose <br />lifts and compaction was achieved utilizing a Cat CS56 smooth drum roller by method specification. <br />Structural fill materials were placed and compacted at the buttress fill below Dump 4. A Cat D8T was used to <br />spread the loose lifts and compaction was achieved utilizing a Cat CS56 smooth drum roller by method <br />specification. <br />Page 1 of 6 MLE2 WE 10.26.13.doc <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D <br />- <br />N <br />N <br />N <br />N <br />N <br />- <br />D = Day Shift N = Night Shift <br />w = Weather Day <br />Ambient Temperature Ranges for reporting period: Weather conditions for reporting period_ <br />Low: 21 *F — 35 °F Cloud Cover: Clear to partly cloudy <br />High: 43 °F — 57 °F Precipitation: None <br />Wind: Calm to gusts at times <br />Ames: Continuing construction tasks for HWY 67 and VLF. <br />Planning: Continuing construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />1) Earthworks <br />A) VLF (Phase 1) <br />Topsoil / Overburden Stripping: No topsoil / overburden stripping activities occurred during this reporting period <br />within the VLF limits. <br />Production drilling: Occurred during this reporting period within the planned VLF limits. <br />Five production blasts' occurred during this reporting period within planned VLF limits. <br />Structural Fill: The contractor continued fill operations and compaction by method specification for the ADR haul <br />road, the Dump 4 buttress fill, and the PSSA Toe Berm. <br />Structural fill materials were placed and compacted for the ADR haul road. A Cat D9T was used to spread the loose <br />lifts and compaction was achieved utilizing a Cat CS56 smooth drum roller by method specification and any <br />oversized material was broken with a Cat excavator hammer -hoe. <br />Structural fill materials were placed and compacted at the PSSA toe berm. A Cat D8T was used to spread the loose <br />lifts and compaction was achieved utilizing a Cat CS56 smooth drum roller by method specification. <br />Structural fill materials were placed and compacted at the buttress fill below Dump 4. A Cat D8T was used to <br />spread the loose lifts and compaction was achieved utilizing a Cat CS56 smooth drum roller by method <br />specification. <br />Page 1 of 6 MLE2 WE 10.26.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.