Laserfiche WebLink
WTIAM <br />I M'' <br />H) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />DCF: Sample Numbers 33 and 34 was obtained during this reporting period. <br />SLF: Sample Numbers 66 and 67 was obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: The Weekly Project Status meeting was held on November 611 between CC &V, Ames, CDOT <br />and Amec. <br />Summary of Concerns: None <br />C'C& V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Eric Lorenson Date: 9Nov2013 <br />Reviewed By. Date: <br />Tim Burkhard <br />Project Resident Manager <br />Phone: 505.975.8655 <br />Approved By: Date: 4 <br />Page 3 of 6 MLE2 WE 11.9.13.doc <br />