My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-11-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:25 PM
Creation date
11/22/2013 1:46:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/21/2013
Doc Name
Weekly CQA Reports- 10/26/13, 11/02/13 and 11/09/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Twilm <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner-: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment <br />74201125N0. 11.09.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Atnes Construction Co. Inc. <br />Reporting Period: 11.03.13 thru 11.09.13 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />I S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />D = Day Shift N = Night Shift <br />w = Weather Day <br />Ain bient Temperature Ranges for reporting period: Weather conditions for reporting period: <br />Low: 9 °F — 34 °F Cloud Cover: Dense fog to partly cloudy <br />High: 28 °F — 52T Precipitation: Snow Tuesday. <br />Wind: Calm to gusts at times <br />Ames: Continuing construction tasks for HWY 67 and VLF. <br />Planning: Continuing construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) VLF (Phase I) <br />Topsoil 1 Overburden Stripping: A Cat D8T GPS was clearing and grubbing / pushing surface soils downgradient <br />from stations Q2 +00 to Q4 +00. <br />Production drilling: Production drilling occurred during this reporting period within the planned VLF limits. <br />Five production blasts' occurred during this reporting period within planned VLF limits. <br />Structural Fill: <br />Structural fill materials were placed and compacted at the buttress fill below Dump 4 near Bench H. A Cat D8R and <br />D9R dozer were used to spread the loose lifts and compaction was achieved utilizing a Cat CS56 smooth drum <br />roller by method specification. Any oversized material was broken by a Cat 345 excavator hammer -hoe. <br />Structural fill materials were placed and compacted at the PSSA toe berm. A Cat D8T was used to spread the loose <br />lifts and compaction was achieved utilizing a Cat CS56 smooth drum roller by method specification. <br />Structural fill materials were produced from slope grading behind the Crib Wall adjacent to the Ball Mill fill from <br />Benches "B" and "DD" and along Bench "A" in the vicinity the former Highway 67 roadway. Materials generated <br />were used as fill at the PSSA toe berm and below Dump 4. <br />D8 dozers placed cut to fill near Bench F between approximate stations F12 +00 to F4 +00. The fill was compacted <br />per method spec by a Cat smooth drum roller. <br />Page 1 of 6 MLE2 WE 11.9.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.