i <br />�a amet <br />Q Higfiway 67 <br />Guardrail installation and the placement of the second (top) mat of asphalt pavement continued at the highway <br />realignment. Pavement operations were completed on 10- 25 -13. <br />Class 6 material was placed at the edge of the pavement along the shoulders of the Realignment. <br />Temporary paint striping was placed on the Highway Realignment. <br />Official permission to demolish the old section of SH -67 came from Lesley Mace (CDOT) on 10 -29 -2013. <br />South MSE Wall: <br />No progress occurred during this reporting period. Progress is waiting on leveling mat construction and timber <br />connection placement. <br />In Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />I) Field Activities: Observation of construction activities during this reporting period included: Tree removal, Production <br />drilling and blasting, VLFIPSSA Cut to Fill and compaction, HWY 67 construction, Underground remediation, clay <br />(SLF) processing. <br />H) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample Numbers 64 thru 65 was obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: The Weekly Project Status meeting was held on October 3011 between CC &V, Ames, CDOT and <br />Amec. <br />Summary of Concerns: None <br />CC& 1-: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />Reviewed B <br />Tim Burkltard <br />Project Resident Manager <br />Phone: 505.975.8655 <br />Approved By. <br />Date: - 2 <br />Date: //- /: _ /`j <br />Page 3 of 6 MLE2 WE 1 l .2.13.doe <br />