My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-21_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-11-21_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:25 PM
Creation date
11/22/2013 1:46:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/21/2013
Doc Name
Weekly CQA Reports- 10/26/13, 11/02/13 and 11/09/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />�a amet <br />Q Higfiway 67 <br />Guardrail installation and the placement of the second (top) mat of asphalt pavement continued at the highway <br />realignment. Pavement operations were completed on 10- 25 -13. <br />Class 6 material was placed at the edge of the pavement along the shoulders of the Realignment. <br />Temporary paint striping was placed on the Highway Realignment. <br />Official permission to demolish the old section of SH -67 came from Lesley Mace (CDOT) on 10 -29 -2013. <br />South MSE Wall: <br />No progress occurred during this reporting period. Progress is waiting on leveling mat construction and timber <br />connection placement. <br />In Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />I) Field Activities: Observation of construction activities during this reporting period included: Tree removal, Production <br />drilling and blasting, VLFIPSSA Cut to Fill and compaction, HWY 67 construction, Underground remediation, clay <br />(SLF) processing. <br />H) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample Numbers 64 thru 65 was obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: The Weekly Project Status meeting was held on October 3011 between CC &V, Ames, CDOT and <br />Amec. <br />Summary of Concerns: None <br />CC& 1-: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />Reviewed B <br />Tim Burkltard <br />Project Resident Manager <br />Phone: 505.975.8655 <br />Approved By. <br />Date: - 2 <br />Date: //- /: _ /`j <br />Page 3 of 6 MLE2 WE 1 l .2.13.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.