Laserfiche WebLink
Susan Burgmaier -2- November 15, 2013 <br />3b DRMS - The Division has previously discussed the need for updated maps and <br />cross sections to be submitted after BRL has completed foundation <br />preparations at Gob Pile #3. In addition to the updated maps and cross - <br />sections, BRL will need to complete an updated material balance for Gob Pile <br />#3. <br />BRL - Comment noted. <br />3c DRMS - Please revise the third paragraph of page 4a of Volume XI to add a <br />sentence indicating that coverfill and refuse mixing will be managed to ensure <br />that the minimum amount of required coverfill material to cover Gob Pile #3 <br />will be reserved at all times. <br />BRL - The language was added to the third paragraph of page 4a. <br />Pages 12 and 13 in Volume IX and page 4a in Volume XI were revised and are <br />enclosed. <br />Please feel free to contact me if you have any questions <br />Sincerely, <br />J. E. Stover, P. E. <br />Consulting Engineer <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />