Laserfiche WebLink
VOLUME IX <br />COAL MINE WASTE DISPOSAL AREA NO. 2 <br />Introduction........................................................................................ ..............................1 <br />GeneralPlan ...................................................................................... ..............................2 <br />DetailedDesign ................................................................................. ..............................4 <br />Construction...................................................................................... ..............................6 <br />Water Control Measures ................................................................... ..............................8 <br />SedimentationPond ......................................................................... .............................10 <br />Placementand Compaction ............................................................. .............................12 <br />Inspection......................................................................................... .............................13 <br />Reclamation...................................................................................... .............................14 <br />StabilityAnalysis ............................................................................... .............................16 <br />• Buckhorn Geotech — Gob Pile #2 Revised Stability Evaluations dated July 29, 2013 <br />• Buckhorn Geotech — Gob Pile #4 Revised Stability Evaluations dated November 20, 2012 <br />• Buckhorn Geotech — Gob Pile #2 Expansion Stability Evaluations dated November 9, 2012 <br />• Buckhorn Geotech - As -built Evaluation of gob pile #4 dated September 5, 2012 <br />• Buckhorn Geotech — Revised Stability Evaluations dated May 18, 2009 <br />• Buckhorn Geotech — Revised Stability Evaluations dated September 22, 2008 <br />• Buckhorn Geotech — Geotechnical Report dated February 1, 2007 <br />• Lambert & Associates — Geotechnical Engineering Study dated March 17, 2005 <br />• Lambert & Associates — Geotechnical Engineering Study dated January 13, 2005 <br />• Lambert & Associates — Geotechnical Engineering Study dated November 10, 2003 <br />Appendix A Material Balance <br />Appendix B Protection of the Hydrologic Balance <br />Appendix C Reclamation Estimate <br />Figure 1 Coal Mine Waste Disposal Area <br />Figure 2 Drainage Plans <br />Figure 3 Pond F Detail <br />Figure 4 Pond F Emergency Spillway Detail <br />TR -81 xiii 09/27/13 <br />