My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-13_REVISION - M1990098 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990098
>
2013-11-13_REVISION - M1990098 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:23 PM
Creation date
11/20/2013 7:16:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
REVISION
Doc Date
11/13/2013
Doc Name
Bond Reduction Request
From
Northern Colorado Constructors, Inc.
To
DRMS
Type & Sequence
SR1
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Backfill Pit Walls: Task No. 6 Direct Costs be reduced from $392,399 to $176,580 <br />because 55% of the perimeter pit walls have been backfilled to the reclaimed slope <br />where mining has been completed. The perimeter of the pit is approximately 6,090 lineal <br />feet of which 3,335 lineal feet has been backfilled and reclaimed. <br />By reducing the previous items the total direct cost for the bonding is reduced from <br />$1,164,711 to $250,805. <br />The indirect costs are then reduced to the following for overhead and profit: <br />Liability Insurance = 1.55% of $250,805 = $3,888 <br />Performance Bond = 1.05% of $250,805 = $2,633 <br />Job Superintendent = 500 hrs - Reduce by 250 (because slopes are 55% complete for <br />backfill and slurry wall is installed) = 250 hrs at $33.50 per hr = $8,375 <br />Overhead and Profit = 10% of $250,805 = $25,080 <br />Total Overhead and Profit = $39,976 <br />The indirect costs are then reduced to the following for project management: <br />Engineering work and /or contract/bid preparation = 4.25% of $250,805 = $10,659 <br />Reclamation management and /or administration = 5.00% of $250,805 = $12,540 <br />Total Indirect Costs including Project Management, Overhead, and Profit = $63,175 <br />Total Bond Amount (Direct plus Indirect) _ $313,980 <br />Asphalt Paving Company appreciates your consideration of this bond reduction request and <br />looks forward to your response. <br />Please feel free to contact me with any questions or comments. <br />Sincerely, <br />
The URL can be used to link to this page
Your browser does not support the video tag.