My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-10-04_REVISION - M1990098
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990098
>
2001-10-04_REVISION - M1990098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:13:53 PM
Creation date
11/20/2013 7:16:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990098
IBM Index Class Name
Revision
Doc Date
10/4/2001
Doc Name
Cost Estimate/Summary
From
DMG
To
File
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CI!3CIES Cost Eatimating Software <br /> EQUIPMEII MOBILgAT10N f DEMOBILMATION <br /> PROJECT IDENTIFICATION <br /> Agency or organization name-CoA"W Divrsan OI Minerals And Geokgy <br /> Task a 001 State:Colorado PamnMob It M-1990-098 <br /> Date: 70o442001 County:Weld Abbreviation,none <br /> User: KAP Site;Perry Pit F1Jename:44096.00r <br /> Perms or other lob action:Permh Amendment Am-Ot <br /> Task description Mobilize and demobilize equipment for reclamation <br /> EOMPMENT TRANSPORT RIO COST Shin basis: 1 per dBy <br /> Cost date source: CRG Da to <br /> Truck tractor descriplwn Generic ori-highway truck tractor,6x4,diesel powered.400 HP <br /> Truth%railer description Generic folan oosaneck,drop deck a uipmenf trailer(25T.SOT,and 90T) <br /> Available rig capacities. 0-25 Tons 26.50 Tone 51.Tons <br /> Cost RrBakdowe-, Ownership eostlhour• 524.23 $28 32 $30 84 <br /> Operating coWhour: $3025 S32.95 53462 <br /> Operatorcoatrhour $26.54 $2654 S2654 <br /> Helper wsuVhaur $2270 $22.70 $22.70 <br /> Total Unit CosUhour $103 71 $11050 S114 69 <br /> NON-ROADABLE EQUIPMENT <br /> Machine Weight/unit ownership Haui Rig Fleet Size Haul Trip Return Trip DOT permd <br /> Description (Tons) Cosft/unq CosUhrlunA (No,units) Cost/hrmeat C0500leel I CosVfleet <br /> -Cef DeR•aSU 5222 $49.50 5114,69 4 $656.79 JOB77 $0 00 <br /> -Car623F 3892 $50.47 $1 it)50 2 $321.94 SMI-00 5000 <br /> -CAT615F 229r $4844 S10371 2 S30430 $20742 $000 <br /> -CAT 14H 2O70 S3a.44 S70371 2 $28030 $207.42 SO.00 <br /> -ContiffuW1 pump,120,n 2 80 $43 24 $103 71 3 S440 84 $311.13 WOO <br /> -Revs tetron equip 2000 $60 00 $103 71 2 S327 42 S207.42 $0,00 <br /> Subtotals: $2.331.60 $1,613.17 $0.00 <br /> ROADABIEEQUIPMENT <br /> Mach-no Total Fleel Size J Haui Trip Return Trip <br /> Description asUhourfund (No units) Costuhrltlaet CosUhrmeat <br /> -Water Tanker,2.500 Gal $51 21 1 S51 21 S61 21 <br /> -Fuel Tanker,4x2,770 HP 561 64 f $61 64 S61.64 <br /> -Luba Truck,4x2,170 HP $72 62 1 S72.62 S72 62 <br /> -Light Duty Pickup.4x4,3M T. $6635 2 $13270 513270 <br /> Subtatale: $318.17 5316.17 <br /> EGIMPMENI HAUL DISTANCE and na <br /> Nearest major city or town within project area region: Brighton <br /> Transnorlslion Cycle Time: Non. Total one-way trawl distance- 80 mijas <br /> Roadable Roadable Average travel speed: Soo mph <br /> Equipment Equipment <br /> Haul time(tours)= 0 18 G 16 Total non-roadable mobtdemob cost'- $70.588 74 <br /> Retumhms(hours)= 0.16 Die -twmun4lrv$Withh.uirie <br /> Loading time(hours)r 100 NA Total roadable mobldemob cost". $101.81 <br /> Unloading time(hours) 1.00 NA "on.routs vtp,no NW ne <br /> Subtotals= ?32 0 32 <br /> JOB TIME AND COST Total job tine• 4.64 hours <br /> Total Job cast $10,691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.