Laserfiche WebLink
i,,11. it <br />! Page 2 of 3 <br />According to C.R S. 34,32) -? ; 6 er 3 -32 -t 16. -eaclr rear. on the anniv er ary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and -Nfap shoa ing the extent of current disturbances to affected land, required <br />monitoring information, rectamation accomplished to date and during the preceding Year_ Z!y new disturbance that is <br />anticipated to occur during the u c ear. any, reclamation that will be performed durm2 the upcoming year, the <br />dates for the b of act€§ L open,,ors e date active operation, ceased for tire ter. <br />LIUR'-r=--xiom z ed. in this rep- -- �. E -'ve �� a-ed by the Division upan recc -tt r <br />_ u -a �z sip_ _asp ioa to the next co can <br />� bile ce i g reps -. �; a 1 z;::an- Y O r sire � t o in co �� mpules <br />_ n��ce vrith the rules d the <br />G`v_ . i� ac :43��:� L��::.� -e i$'S�iiS ° F .a,•i <br />'�:d 7mtss i�_i i'�"�?_ii'L . t1: ^ac- <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). e yES) NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES O <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. RECEIVED ��zAQ <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />NOV 15 201 <br />Division of Reciamati 71—C <br />Mining & Safety <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />backfilled: <br />112c Annual Report <br />Permittee Name: <br />Sou-t Rdy=ix Inc <br />;Permit Iti {umber. <br />I'M-1983-175 <br />Operation Name: <br />A!an osa Pit No. 2 <br />County.- <br />Alamosa <br />Annual Fee Due: <br />S 9;.00 <br />` Anniversary Date: <br />November 25, 2013 <br />Perms: Aere ---- <br />40 =t <br />; Current Bond Amt: <br />5736.602.55 <br />According to C.R S. 34,32) -? ; 6 er 3 -32 -t 16. -eaclr rear. on the anniv er ary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and -Nfap shoa ing the extent of current disturbances to affected land, required <br />monitoring information, rectamation accomplished to date and during the preceding Year_ Z!y new disturbance that is <br />anticipated to occur during the u c ear. any, reclamation that will be performed durm2 the upcoming year, the <br />dates for the b of act€§ L open,,ors e date active operation, ceased for tire ter. <br />LIUR'-r=--xiom z ed. in this rep- -- �. E -'ve �� a-ed by the Division upan recc -tt r <br />_ u -a �z sip_ _asp ioa to the next co can <br />� bile ce i g reps -. �; a 1 z;::an- Y O r sire � t o in co �� mpules <br />_ n��ce vrith the rules d the <br />G`v_ . i� ac :43��:� L��::.� -e i$'S�iiS ° F .a,•i <br />'�:d 7mtss i�_i i'�"�?_ii'L . t1: ^ac- <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). e yES) NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES <br />b) approval for INTERMITTENT OPERATION? YES O <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. RECEIVED ��zAQ <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />NOV 15 201 <br />Division of Reciamati 71—C <br />Mining & Safety <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />backfilled: <br />Total acres �� <br />�� <br />Total acres <br />-f- <br />Total acres <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />Y3 <br />approved mix: <br />replaced- <br />approved mulch. <br />Total acres <br />Total acres <br />l3 <br />Topsoil <br />Mulch application <br />graded: <br />12 b <br />fertilized w/ <br />replacements <br />rate (tons/ac): <br />apvd fertilizer. <br />depth (in.): <br />w <br />Seed <br />Fertilizer <br />- <br />Munch <br />t YJ <br />application <br />�� <br />application <br />I <br />/� <br />1 <br />application <br />D <br />method: <br />b <br />method: <br />method: <br />