Laserfiche WebLink
RFDEIVED <br />Nov i q�6r3 <br />DiWsion venation, <br />Noing ano Safety <br />110c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Timothy D. Williams & <br />Betty J. Williams <br />Permit Number: <br />M- 2010 -054 <br />Operation Name: <br />Williams Pit No. 1 <br />County: <br />Huerfano <br />Annual Fee Due: <br />$323.00 <br />Anniversary Date: <br />December 8, 2013 <br />Permit Acreage: <br />9.85 <br />Current Bond Amt: <br />$27,100.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, rcclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you team that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES;; ' please note time limits related to completion of reclamation, Rule 3.1.3. <br />Jllo ;'L) "rr <br />ATE <br />5. Does the mine operate more than 180 days per year? 15*FcM 'fib¢. MORE 1 WN 180 S NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES N <br />b) approval for INTERMITTENT OPERATION? YES NO <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />YES NO <br />YES NO <br />YES Q <br />7. Number of acres currently affected (mining + incomplete and or unrelowd t <br />p <br />8. Number of acres that were newly affected during the current report year. NOV 14 Mo <br />9. Number of acres that were reclaimed during the current report year. <br />DIVISION of Rirfititara° <br />10. Estimated new acreage to be affected in the next report year. MINING kdU Se,iFa,Y <br />11. Estimated acres to be reclaimed in the next report year. <br />12 Total acres in various stages of reclamation, since permitted mining activities be an: <br />ter= <br />-e- <br />Total acres <br />Total acres <br />pF R <br />Total acres <br />pE2 <br />Total acres <br />?F—;L <br />backftlled: <br />seeded w/ <br />p fq q <br />w /topsoil <br />LA � <br />mulched w/ <br />ArA <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />'? & r? <br />Total acres <br />"PC: (L <br />Topsoil <br />—I" <br />Mulch application <br />'} E� <br />graded: <br />PLAN( <br />fertilized w/ <br />�qN <br />replacement <br />A,,4 <br />rate (tons/ac): <br />�AN <br />a vd fertilizer: <br />depth in.: <br />Seed <br />2' AN <br />Fertilizer <br />2 lkAN <br />Mulch <br />j ,2 PL4N <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />