Laserfiche WebLink
Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />1.000 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2152 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />267.54 LCY /hr <br />267.54 LCY /hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.932/LCY <br />Total job time: <br />Total job cost: <br />153.22 Hours <br />$38,216.35 <br />Page 5 of 7 <br />C[RCES Cost Estimating Software <br />