My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-14_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-11-14_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:17 PM
Creation date
11/18/2013 8:55:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
11/14/2013
Doc Name
Reclamation Cost Estimate (Emailed
From
DRMS
To
Jim Stover
Type & Sequence
TR83
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Cost <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Technical <br />Revision 83 <br />Task #: 353 State: Colorado <br />Date: 10/22/2013 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Page 1 of 4 <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -353 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />350 <br />351 <br />NA <br />NA1 <br />Haul Fill from Upper Mat'l Strge Area to B -Seam <br />Portal Bench <br />SCRAPERI <br />1 <br />1 <br />1 <br />1 <br />60.63 <br />$33,764.22 <br />$1,375.49 <br />($38,958.71) <br />($1,280.63) <br />Remove additional 270' Culvert C7 <br />DEMOLISH <br />80.00 <br />Credit Task 350 TR -79 <br />NA <br />9.33 <br />Credit Task 351 TR -79 <br />NA <br />0.50 <br />SUBTOTALS: <br />150.46 <br />($5,099.63) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />Liability insurance: <br />2.02% <br />Total = <br />($103.01) <br />Performance bond: <br />1.05% <br />Total = <br />($53.55) <br />Job superintendent: <br />0.00 hrs <br />Total = <br />$0.00 <br />Profit: <br />10.00% <br />Total = <br />($509.96) <br />Total = <br />$0.00 <br />TOTAL O & P = <br />($666.52) <br />TOTAL INDIRECT COST = <br />CONTRACT AMOUNT (direct + O & P) = <br />($5,766.15) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total = <br />($230.65) <br />Reclamation management and /or administration: <br />3.13% <br />($180.48) <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />($1,077.65) <br />TOTAL BOND AMOUNT (direct + indirect) = <br />($6,177.28) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.