Laserfiche WebLink
-6- <br />2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a finding that the permittee <br />violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information <br />contained in the application or your permit misrepresent important material facts; <br />' 3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit <br />boundary, substantial civil penalties, to you as permittee can result; <br />�T 4. Any modification to the approved mining and reclamation plan from those described in your approved <br />application requires you to submit a permit modification and obtain approval from the Board or Office; <br />5. It is your responsibility to notify the Office of any changes in your address or phone number, <br />5 r 6. Upon permit issuance and prior to beginning on -site mining activity, you must post a sign at the entrance of <br />the mine site, which shall be clearly visible from the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br />Reclamation Board; and, <br />c. the permit number. <br />7. The boundaries ofthe permit boundary area must be marked by monuments or other markers that are clearly <br />visible and adequate to delineate such boundaries prior to site disturbance. <br />8. it is a provision of this permit that the operations will be conducted in accordance with the terms and <br />conditions listed in your application, as well as with the provisions ofthe Act and the Construction Material Rules <br />and Regulations in effect at the time the permit Is issued. <br />157r 9. Annually, on the anniversary date of permit issuance, you must submit an annual fee as specified by Statute, <br />and an annual report which includes a map describing the acreage affected and the acreage reclaimed to date (if <br />there are changes from the previous year), any monitoring required by the Reclamation Plan to be submitted <br />annually on the anniversary date ofthe permit approval. Annual fees are for the previous year a permit is held. For <br />example, a permit with the anniversary date ofluly 1, 1995, the annual fee is for the period of July 1. 1994 through <br />June 30, 1995. Failure to submit your annual fa and report by the permit anniversary date may result in a civil <br />penalty, revocation of your permit, and forfeiture of your financial warranty. It Is your responsibility, as the <br />permittee, to continue to pay your annual fee to the Office until the Board releases you From your total reclamation <br />responsibility. <br />i 10. For joint ventuMIgartnershlp operators: the signing representative is authorized to sign this document and a <br />power or attorney (provided by the partner(s)) authorizing the signature of the representative is attached to this <br />application. <br />