Laserfiche WebLink
Page 24 of 121 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile I to Shop and Explosive Site <br />Site: Seneca II -W Mine Permit Action: MT6 Permit /Job #: C1982057 <br />PROJECT IDENTIFICATION <br />Task #: 050 State: Colorado <br />Date: 6/20/2013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: C057 -050 <br />COSTShift basis: leer day <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 10,000 Gal. <br />Cmd Breakdown- gcrnner Wnrk Team 7Z--rt Rn,,:n,.,o «r <br />Total work team cost/hour: $1,628.20 <br />MATERIAL QUANTITIES <br />Initial volume: 37,589 CCY Swell factor: 1.000 <br />Loose volume: 37,589 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$100.38 <br />NA <br />NA <br />NA <br />$37.98 <br />$52.97 <br />Operating cost/hour: <br />$235.35 <br />NA <br />NA <br />NA <br />$16.94 <br />$29.77 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />$27.55 <br />$0.00 <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />$82.46 <br />$82.74 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />I Work: <br />$1,463.00 <br />Support: <br />$0.00 <br />Maint: <br />$165.20 <br />Total work team cost/hour: $1,628.20 <br />MATERIAL QUANTITIES <br />Initial volume: 37,589 CCY Swell factor: 1.000 <br />Loose volume: 37,589 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,100 Ibs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Earth - Loam <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />38.86 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />