Laserfiche WebLink
Page 20 of 121 <br />Seneca II -W Mine <br />C- 1982 -057 <br />Midterm Review No. 6 (MT6) <br />19 June 2013 <br />JLE <br />Task 044 Dredge Sediment Ponds $437,728.00 <br />In May of 2001, in conjunction with Permit Renewal No. 3, Seneca Coal Company estimated <br />that the cost to mobilize a dredger and pump ponds 005, 006, 009, 015 and 016 would be <br />$312,663.00. The Division agreed with this estimate. In the new estimate with the addition of <br />Ponds 016A and 017, the Division has increased this estimate by 40% to account for the 40% <br />increase in the number of ponds to be cleaned. <br />($312,663.00) X (1.4) = $437,728.00 <br />CIRCES Cost Estimating Software <br />