My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-15_PERMIT FILE - C1982057A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982057A
>
2013-10-15_PERMIT FILE - C1982057A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:48 PM
Creation date
11/13/2013 2:35:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
10/15/2013
Doc Name
Bond Cost Worksheets
Section_Exhibit Name
Tab 25 Attachment 25-1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: Seneca II -W Mine <br />BULLDOZER WORK <br />Grade Culvert Embankments <br />Permit Action: MT6 <br />PROJECT IDENTIFICATION <br />Task #: 029 State: Colorado <br />Date: 6/19/2013 County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EOL <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat DI IR - I IU <br />850 <br />Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Page 4 of 121 <br />Permit/Job #: C1982057 <br />Abbreviation: None <br />Filename: C057 -029 <br />Total unit Cost/Hour: $460.79 <br />Total Fleet Cost/Hour: $1,843.16 <br />MATERIAL QUANTITIES <br />Initial Volume: 270,000 <br />Swell factor: 1.000 <br />Loose volume: 270,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 2,870.3 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 7,500 feet <br />Material weight: 2,6501bs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$142.46 <br />NA <br />Operating Cost /Hour: <br />$280.92 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $460.79 <br />Total Fleet Cost/Hour: $1,843.16 <br />MATERIAL QUANTITIES <br />Initial Volume: 270,000 <br />Swell factor: 1.000 <br />Loose volume: 270,000 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 2,870.3 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 7,500 feet <br />Material weight: 2,6501bs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.