My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-13_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2013-11-13_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:16 PM
Creation date
11/13/2013 1:11:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
11/13/2013
Doc Name
Adequacy Review Letter and Cost Estimate
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
MR269
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary of MR269 Tasks <br />Site: Foidel Creek Mine Permit Action: MR269 Permit/Job #: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 11/13/2013 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C056 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Plug and Seal 4 Exploration Coreholes <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />40.00 <br />$16,776.02 <br />$1,191.93 <br />$590.01 <br />$689.99 <br />Regrade and Regrade Roads and Pads <br />DOZER <br />5.83 <br />Replace Topsoil on Roads and Pads <br />DOZER <br />2.89 <br />Reseed 1.3 acres disturbance <br />REVEGE <br />4.00 <br />SUBTOTALS: <br />52.72 <br />$19,247.95 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />26.36 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$388.81 <br />$202.10 <br />$1,724.21 <br />$1,924.80 <br />$4,239.92 <br />$23,487.87 <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.00% <br />Total = $939.51 <br />Reclamation management and /or administration: <br />3.13% <br />$735.17 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $5,914.61 <br />TOTAL BOND AMOUNT (direct + indirect) = $25,162.56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.