Laserfiche WebLink
rLE-tKiffi-ft C <br />NFUh-tIng Platil FeOiap-- Pliase P, <br />I-E5 0, VV` <br />Baca, Counity <br />Adjacent Land Owner., <br />Ray Sikes <br />1,400 L.F." <br />I tockpika. Area- <br />IP Ia. nt Sifte <br />-k <br />'7t <br />7 <br />1,800 L.F. <br />1 4-,Zrf Jacent Land Owner <br />y Sikes <br />3 <br />Notes: <br />Adjacent Land Ow ner <br />1,700 LF", Ray Sikes <br />w4i t-ilnn Ar Kea a <br />10tatch Line <br />-cas'Ah"62-1 Pit <br />FP�ern-" ed Ac--es <br />Minino, Area ........................... 9.5 AcreQ <br />J <br />Stock-pille/Plant Site ..............21 Acres <br />❑ Acres Road (2,600' x 33`)..,..2 Acres <br />Permit Boundary ...................... 65 Acre <br />Totals Permit Area ....................67 Acre <br />(including Access Road) <br />2 -6' <br />Topsoil/Erosion Control Berm <br />❑Erosion Berm Typ <br />Mining Direction <br />1) All final slopes shall be 3:1 or flatter. <br />2) The erosion berm will expand to final location as shown on this map as the <br />mine expands outward. <br />1'o I U(4 <br />3) Vertical walls will expand as mining expands until A entrudes on the final JC-' <br />3:1 or flatter slopes. At this point the vertical wall will be shot to meet <br />1 LF. <br />the final slopes. ,960 <br />W <br />4)Vertical high wall will not exceed 1,500 L.F.@ 40' hieghtforthe duration Adjacent Land Ow ner <br />of the mining. Ray A!6p&— =zg- <br />5) All contours are at I ft intervals. C) !C)o 400 <br />Match Line <br />6) Phase B mining and Phase B reclamation will be submitted upon completion of <br />Phase A. <br />Eastern Colorado Aggregates, R.L.L.L.P. <br />4)J26/13 <br />County <br />Raped By James Higgs <br />r. <br />550" <br />t <br />( <br />V <br />10tatch Line <br />-cas'Ah"62-1 Pit <br />FP�ern-" ed Ac--es <br />Minino, Area ........................... 9.5 AcreQ <br />J <br />Stock-pille/Plant Site ..............21 Acres <br />❑ Acres Road (2,600' x 33`)..,..2 Acres <br />Permit Boundary ...................... 65 Acre <br />Totals Permit Area ....................67 Acre <br />(including Access Road) <br />2 -6' <br />Topsoil/Erosion Control Berm <br />❑Erosion Berm Typ <br />Mining Direction <br />1) All final slopes shall be 3:1 or flatter. <br />2) The erosion berm will expand to final location as shown on this map as the <br />mine expands outward. <br />1'o I U(4 <br />3) Vertical walls will expand as mining expands until A entrudes on the final JC-' <br />3:1 or flatter slopes. At this point the vertical wall will be shot to meet <br />1 LF. <br />the final slopes. ,960 <br />W <br />4)Vertical high wall will not exceed 1,500 L.F.@ 40' hieghtforthe duration Adjacent Land Ow ner <br />of the mining. Ray A!6p&— =zg- <br />5) All contours are at I ft intervals. C) !C)o 400 <br />Match Line <br />6) Phase B mining and Phase B reclamation will be submitted upon completion of <br />Phase A. <br />Eastern Colorado Aggregates, R.L.L.L.P. <br />4)J26/13 <br />County <br />Raped By James Higgs <br />