My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-11-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:06 PM
Creation date
11/7/2013 8:17:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/6/2013
Doc Name
Weekly CQA Reports- 10/5/13, 10/12/13, and 10/19/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-roll <br />CRIPPLE CREEL{ & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weeldy Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number: Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. 10.12.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 10.06.13 thru 10.12.13 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />I S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />DID <br />- <br />N <br />N <br />N <br />N <br />N <br />IN <br />D = Day Shift N = Night Shift <br />w = Weather Day <br />Ambient Temperature Ranges for reporting period: <br />Low: 25 °F — 357 <br />High: 48 °F — 63 °F <br />Weather conditions for reporting period: <br />Cloud Cover: Partly Cloudy / Cloudy <br />Precipitation: Rain /Snow <br />Wind: Calla to Gusts at times <br />Ames: Continuing construction tasks for HWY 67 and VLF. <br />Planning: Continuing Construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) VLF (Phase 1) <br />Topsoil ! Overburden Stripping: During this reporting period, topsoil materials were observed being hauled to <br />area 34 stockpile from west of the crib wall and near Bench "C ". <br />Production drilling: Occurred during this reporting period within the planned VLF limits. <br />Three production blasts' occurred during this reporting period within planned VLF limits. <br />Structural Fill: The contractor continued fill operations and compaction by method specification for the ADR haul <br />road the PSSA Toe Berm and the planned VLF 2:1 slope near "C" and "F" bench. In addition slope grading occurred <br />on the PSSA toe berm. <br />Structural fill materials were placed and compacted for the ADR haul road. A Cat D8T was used to spread the loose <br />lifts and compaction was achieved utilizing a Cat 563 smooth drum roller by method specification. <br />Structural fill materials were placed from 2;1 cut then compacted near "C" and T" bench close to midway. Materials <br />used as fill were placed in 24 inch loose lifts and compacted by method specification utilizing a Cat CS56B Smooth <br />Drum roller <br />See Hwy 67 embankment fill below for additional detail on materials placed. <br />Page 1 of 6 NI LE2 WE 10.12.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.