My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-11-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:37:06 PM
Creation date
11/7/2013 8:17:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/6/2013
Doc Name
Weekly CQA Reports- 10/5/13, 10/12/13, and 10/19/13.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amee <br />topsoil material was spread along the North bound travel lane shoulder. <br />Erosion protectors were installed along the guardrail and sign bases were installed adjacent to the South MSE Wall. <br />South MSE Wall: <br />No progress occurred during this reporting period. Progress is waiting on leveling mat construction and timber <br />connection placement. <br />II) Storm Water Management <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: <br />topsoil stripping, production drilling and blasting, VLF /PSSA Cut to Fill and compaction, HWY 67 construction, <br />Underground remediation, clay (SLF) processing. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period, <br />SLF: Sample No. 60 thru 61 was obtained during this reporting period <br />DCF: Sample No. 29 was obtained during this reporting period, <br />Cdot: Split sample of reinforced backfill (RFB -4) material was obtained and re- tested during this reporting period. <br />General Proiiect Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on October 161h between CC &V, Ames, <br />CDOT and Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning, <br />Summary of Concerns: None <br />CC& V. Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: <br />Thorne M Clark / <br />Project Resident Manager <br />Ph: 970.846.9337 <br />Approved By: «� (�lt.� /� Date: <br />Page 3 of 6 MLE2 WE 10.19.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.